The time frame
Within the next two years (at the beginning of 2021) an independent European body must be in place and the first PSO contracts be offered from then.
- The first European initiated trains can then run from December 2021.
- 2024: A minimum network is established and running.
- 2024-2030: Capacity is increased and investments are made to remove bottlenecks in the technical infrastructure.
- 2030: Air transport within Europe is no longer needed and can come to an end.